Wendy
21-05-2011, 12:36 PM
Phase One renovations at the Disneyland Hotel are almost completed, just in time for summer 2011. The renovations include new décor in the rooms, a new pool-and-slide water play area, and three new themed suites - Fantasy, Big Thunder and Adventureland.- joining the existing Mickey Mouse and Pirates suites.
Also opening this summer will be the poolside Tangaroa Terrace restaurant and Trader Sam’s bar, inspired by classic features found in Adventureland in Disneyland.
Phase Two renovations, scheduled to open in the fall will include enhancements to the existing pool, the main lobby, the porte-cochere and the façade of the hotel convention center.
Also opening this summer will be the poolside Tangaroa Terrace restaurant and Trader Sam’s bar, inspired by classic features found in Adventureland in Disneyland.
Phase Two renovations, scheduled to open in the fall will include enhancements to the existing pool, the main lobby, the porte-cochere and the façade of the hotel convention center.